IRTM Solar
Request a quote

Services · Dubai, UAE

Solar, sourced and
built end to end.

Tier-1 modules by the container, matched systems for homes and businesses, turnkey installation and independent engineering advice. One partner, one point of contact, from the first drawing to the last cable.

Request a quote
Tier-1 manufacturers we deal in
0
720 W modules per 40' HC container
≈ 0
days from advance to first delivery
≈ 0
years of linear power warranty
0

What we do

Four services, one accountable partner

B2B · Container supply

Wholesale module supply

Direct container-level supply of Tier-1 modules from LONGi, JinkoSolar, Trina Solar, JA Solar and Tongwei, quoted in US dollars and shipped from China to your port.

What's included

  • FOB China or CIF to your port
  • Approx. 620 × 720 W modules per 40' HC container
  • Brand-new Grade-A stock, produced after your purchase order
  • Flash-test report for every module

What you receive

  • Proforma invoice with full datasheet
  • Flash-test data per serial number
  • Packing list and certificate of origin
  • Bill of lading, plus insurance on CIF orders
Who it's for
Distributors, EPC contractors, developers and installers buying by the pallet or by the container.
Typical project size
One pallet (33 modules) up to multi-container utility orders
Timeline
First delivery from about 35 days after the advance payment
Homes · Businesses

Home & commercial systems

Matched, ready-to-install systems for villas, farms, schools, factories and warehouses, sized to your roof and your electricity bill.

What's included

  • On-grid, hybrid and off-grid systems
  • Hybrid inverters with lithium (LFP) storage
  • Roof, carport and ground mounting
  • Sized to your roof area and electricity bill

What you receive

  • System design and single-line diagram
  • Matched bill of materials
  • Yield and savings estimate
  • Manuals and warranty documents
Who it's for
Villa owners, farms, schools, retailers and industrial sites that want lower bills and backup power.
Typical project size
From 5 kWp homes to rooftops above 1 MWp
Timeline
Design within a week; delivery depends on the configuration
Turnkey · On site

Installation & EPC

Turnkey engineering, procurement and construction through certified installation partners, with one contract and one team accountable for the result.

What's included

  • Site survey and structural check
  • Installation, commissioning and grid-connection support
  • Monitoring setup and handover training
  • Operation & maintenance, including module cleaning

What you receive

  • Survey report and structural assessment
  • Construction and as-built drawings
  • Commissioning and test reports
  • Monitoring access and O&M plan
Who it's for
Commercial and industrial owners, developers and public facilities that want a single accountable contractor.
Typical project size
50 kWp rooftops to multi-megawatt ground-mount plants
Timeline
Usually 4–12 weeks on site, depending on size and permits
Engineering · Advisory

Consulting & design

Independent technical advice that makes your project bankable: yield, layout, specifications and procurement, checked before money is committed.

What's included

  • Feasibility studies and yield simulations
  • String sizing, layout and row-spacing design
  • Technical specifications and tender support
  • Procurement strategy and supplier comparison

What you receive

  • Feasibility report with yield simulation
  • Layout, string and row-spacing design
  • Technical specification for tender
  • Bid and supplier comparison
Who it's for
Investors, developers, consultants and procurement teams preparing a tender or an investment decision.
Typical project size
Single sites to portfolio-scale programmes
Timeline
About 2–4 weeks for a typical feasibility study

How an order works

From first message to modules on site

Container orders follow the same six clear steps, so you always know what happens next and what it depends on.

  1. 01

    Enquiry

    Day 0

    Tell us the quantity, module class and destination port.

  2. 02

    Proforma invoice

    1–2 business days

    Price, specifications, Incoterms and schedule in one document, valid for 8 days.

  3. 03

    30% advance

    On signing

    The advance payment confirms the order and secures the production slot.

  4. 04

    Production & inspection

    ≈ 3–4 weeks

    Modules are produced fresh for your order. Third-party inspection on request.

  5. 05

    Shipping FOB / CIF

    From ≈ 35 days

    The 70% balance is paid before loading. FOB China, or CIF to your port.

  6. 06

    Delivery

    1–8 weeks transit

    Original documents are released, you clear customs at destination and the modules go to site.

Quality & certification

Quality you can verify, not just trust

Every module we supply carries the international certifications lenders and utilities ask for, and every shipment travels with its paperwork.

product warranty
0 yr
linear power warranty
0 yr
minimum power guaranteed at year 30 (best warranty)
0.0%
  • IEC 61215Design qualification and type approval
  • IEC 61730Module safety qualification
  • IEC 61701Salt-mist corrosion resistance
  • IEC 62716Ammonia corrosion resistance
  • ISO 9001Quality management
  • ISO 14001Environmental management
  • ISO 45001Occupational health and safety
  • CEEuropean conformity

Pre-shipment inspection

SGS · Bureau Veritas · TÜV

Independent inspection before loading, arranged on request at the buyer's cost.

With every shipment

  • Certificate of origin
  • Packing list
  • Flash-test certificates
  • Manufacturer warranty

Brands we deal in

Container and pallet supply from five of the world's largest module manufacturers.

Coverage

Based in Dubai. Shipping worldwide.

We source from production hubs in China and deliver across the Gulf, Africa, Asia, Europe and the Americas, with transit times from one to eight weeks depending on destination.

  • Dubai · Head office
  • Shanghai · Loading port
Ask about your destination
Dubai · Head officeShanghai · Loading port

FAQ

Questions buyers ask us first

  • Our pricing is built for container volumes, about 620 modules in a 40' HC container. Smaller orders, from one pallet of 33 modules, are quoted case by case.

Tell us what you are building.

Share the size, the site and the timing. We reply with a clear proposal within one business day.

Services · IRTM Solar