Construction of ground-mounted solar plants: labor, civil works, electrical works and commissioning. Modules, inverters and structure are priced separately.

For utility-scale plants we provide the construction part of EPC: site preparation and grading, fencing and roads, pile driving or foundations, structure and tracker assembly, module mounting, DC trenching and cabling, inverter and transformer station installation, MV collection system, earthing, lightning protection, and full pre-commissioning and commissioning up to grid synchronization.
The indicative price per kWp covers labor, civil works, electrical installation works and commissioning only. Modules, inverters, mounting structure or trackers, transformers and main cables are supplied separately at catalog or project prices, so the bill of quantities stays transparent and each package can be benchmarked.
Every project is managed with a detailed schedule, quality plan (ITPs), HSE plan and progress reporting. Final pricing depends on soil conditions, terrain, plant size, grid-connection voltage and local labor rules, and is confirmed after a geotechnical study and site visit.

PV layout, string sizing, single-line diagrams, yield simulation and bill of materials, ready for permit and procurement.

Technical and financial assessment of a solar project: resource, yield, CAPEX, OPEX, LCOE, payback and IRR.

Preventive and corrective maintenance, module cleaning, monitoring and performance reporting, priced per kWp per year.

Indicative door-to-port cost per 40' high-cube container from China to Jebel Ali, including port handling.